Deposits: How Much to Ask For and When to Ask
A deposit is working capital, not a sign of trust. Here is how to set the number from the costs you pay before day one, and when to collect it.
Read itMeasuring, pricing and closing work that is sold by the square foot. Written for the person holding the tape.
A deposit is working capital, not a sign of trust. Here is how to set the number from the costs you pay before day one, and when to collect it.
Read itA photo of a room has no units in it. To turn it into feet you bring one known length, stand square, and know which dimensions the money actually rides on — and which ones you should have drawn while you were standing there.
Read itA lower price on Friday often loses to a clear quote sent while you are still in the room. Here is what delay costs a contractor, and how to send a quote the same day without cutting corners.
Read itA per-foot number is a summary of costs that do not scale with area. Here is what has to be inside it before you say the rate out loud.
Read itDraw the room, let it measure itself, price it from your own book and get it signed before you leave the driveway. A walk-through with every screen.
Read itVapour coming up through the slab is the leading cause of coating failure, and the reason most warranty claims get refused.
Read itMeasure the floor and the edge separately, read the slab, price the system and the prep, put unit prices on what you cannot see, and the number you say in the driveway is the number you get paid.
Read it